Work item
CHB Wall Plastering and Laying Area
Sub-total
Tile Works

Bill of Materials
Quantity
Material Description
6? CHB
6116
4? CHB (10cm x 20cm x 40cm)
1453
Portland Cement Advanced
957
Crushed stones or gravel (g-1)
70
Sand (S-1)
60
20×20 cm. floor tiles (Unglazed)
20×30 cm. floor tiles (Glazed)
Tile Adhesive
Tile Grout
158
540
6
21
Total
CANVASS
Description of Material
Masonry Works
Portland Cement Advanced
Crushed stones or gravel (G-1)
Sand (S-1)
CHB
6?
4?
Tile Works
20×20 cm floor tiles (Unglazed)
20×30 cm floor tiles (Glazed)
Tile Adhesive
Tile Grout
Unit
First Hardware
Unit Cost
40 kg/bag
cu.m.
cu.m.
$
$
$
210.00
480.00
650.00
pc
pc
$
$
18.50
8.00
pc
pc
bag
kg
$
$
$
$
8.00
11.00
220.00
40.00
Unit
pc
pc
40kg/bag
cu.m.
cu.m.
Unit Cost
$ 18.50
$ 8.00
$ 210.00
$ 480.00
$ 650.00
pc
pc
Bag
Kg
$ 8.00
$ 11.00
$ 220.00
$ 40.00
Second Hardware
Unit Cost
$
$
$
215.00
480.00
680.00
$
$
19.00
8.00
$
$
$
$
8.00
11.00
225.00
40.00
Total Cost
$ 113,146.00
$ 11,624.00
$ 200,970.00
$ 33,600.00
$ 39,000.00
$ 398,340.00
$ 1,264.00
$ 5,940.00
$ 1,320.00
$
840.00
$ 407,704.00
Description: This week, you need to work on the second component. (If you
worked on Masonry in Weeks 5 and 6, this week you need to
work on Wood Structures.)
Make your calculation spreadsheet more complete by:
(a) adding the second component of the scope of work you
have chosen to your calculation spreadsheet, and by
estimating its quantities using Bluebeam,
(b) assigning unit prices to the quantities of materials, and
(c) estimating labor and equipment costs for your scope of
work
Complete your calculation spreadsheet for the second
component of your work using the instruction provided in the
previous Portfolio Milestones, and provide a maximum of a two-
page narrative to describe your findings (estimated quantities
and costs). Provide a basis-for-estimate document that outlines
assumptions, inclusions, and exclusions of the cost estimate.